ZESA Announces 12-Hour Load-shedding Blackouts

The Zimbabwe Electricity Transmission and Distribution Company (ZETDC) has announced the commencement of 12-hour load-shedding in Zimbabwe.

In a statement, ZETDC said the new extreme load shedding is due to drastically reduced output at Hwange and Kariba power stations.

Reads the statement:


Are you in Zimbabwe?
Read Pindula News without data on your phone on freedata.pindula.co.zw
 
Only Applicable to Econet lines

#FreeData

The ZETDC (Zimbabwe Electricity Transmission and Distribution Company) is experiencing a power shortfall due to generation constraints at Hwange Power Station, limited imports and a programme of dam wall rehabilitation at Kariba, which requires that two generators be taken out for 12 hours. The planned outrage of the two units then restricts Kariba Power Station output during these hours. The power shortfall is being managed through load shedding in order to balance the power supply available and the connected load.

This is the worst power crisis Zimbabwe has faced since 2019, when outages lasted up to 18 hours at a time.

More: NewZWire

 

Join WhatsApp & Telegram News Groups:

WhatsApp Group: https://chat.whatsapp.com/GQskq2munmbLht1yyWzKdO


Telegram Group: https://t.me/pindula

Back to top

4 comments on “ZESA Announces 12-Hour Load-shedding Blackouts

  1. These loadsheddings are not caused by sanctions but by total and utter incompetence on behalf of the govt and Zesa since independence day.

Write a Comment

Your email address will not be published.


Share Full Post

Nyaradzo logo

RSS Recent Profiles Created

Satisfaction survey
How likely is it that you would recommend Pindula News to a friend or colleague?
SuggestionsHow can we improve?
You have already submitted your feedback. If you would like to add more feedback please write us on hello@pindula.com.
ZESA Announces 12-Hour Load-shedding Blackouts